BG | EN

 

 

 

 

 

Reference site 3 for railway transport

Passenger station Plovdiv - ramp coatings – second track“ – „Doubling” “High voltage electrical installation works”

“Passenger station Plovdiv - ramp coatings – second track“ – „Doubling” “High voltage electrical installation works”

 

Investor: NRIC
Client: Transstroy Varna PLC
Location: Railway station Plovdiv
Period of realization: March, 2004 – January, 2005
Role of “Avis Engineering” Ltd. : Executive
Nature of the works:
        - Dismantling works;
        - Electro-installing works;
        - Dismantling works – doubling;
        - Assembly works – doubling;
        - Starting works.

 

 


Gallery:
Created by website.bg