BG | EN

 

 

 

 

 

Reference site 7 for railway transport

„Main repair of Tunnel № 3, of third main rail line. Subproject: Catenary - Dismantling and assembly”

„Main repair of Tunnel № 3, of third main rail line. Subproject: Catenary - Dismantling and assembly”

 

Investor: NRIC
Client: “RVP – Koehne” JSC – Sofia
Location: Three main rail line from km 56 +500 to km 59 +740 between stations: Dolno Kamartci - Mirkovo
Period of realization: September, 2009 – April, 2010
Role of “Avis Engineering” Ltd.: Executive
Nature of the works:
      - Reconstruction and modernization of overhead lines.

 

References of the project: Reference 1 and Reference 2

 


Gallery:
Created by website.bg