Reference site 10 for railway transport
Position 1: “Modernization of the railway section Septemvri- Pazardzhik”
Investor: NRIC
Contractor: Swietelsky – Baugesselschaft m.b.H
Location: Railroad line Septemvri – Pazardzhik
Role of “Avis Engineering” Ltd: Subcontractor
Nature of work:
– Works on the system of catenary and sectional posts;
– Construction of signaling and telecommunications in the area of Septemvri – Pazardzhik;
– Electrical power for Boards of temporary management;
– Dismantling of safety equipment;
– Delivery of materials for parts: Catenary; Heating and lighting switches; Signaling – shafts and underground cable channels.
A good performance certificate can be found here…