Reference site 2 for mine transport

“Sulphurpurify installation – station TEP 3 – overhead lines”

Investor: “Mini Maritsa – Istok” PLC
Client: “Boneti” Ltd.
Location: “EC Maritsa Istok 3”
Period of realization: August, 2005 – November, 2005
Role of “Avis Engineering” Ltd. : Executive
Nature of the works:
– Assembly of poles and foundations;
– Assembly of overhead lines.

Category: