Reference site 5 for tram transport
“Major repair of the track and traffic ways on Krakra Str. in the section from Dondukov Blvd. to Yanko Sakazov Blvd.”
Investor: Sofia Municipality
Client: „TRACE-SOFIA“ EAD
Location: Sofia
Period of realization: June, 2017 – July, 2017
Role of “Avis Engineering” Ltd.: Contractor
Nature of the works:
– Poles and foundations;
– Catenary;
– Cable network up to 1 kV.